From first photo to final handover.
Four steps, each with a purpose. The aim is that you know what is suitable, what you are getting and what to expect before any film goes on.
- 01
Visit the project
We start with the surfaces. You send photos, or we visit, and we look at material, condition, edges, heat and wet zones. If wrapping is not suitable, we say so and explain why.
- Photos or a site visit
- Material, condition and edges
- Heat and wet zones
- An honest view on suitability
- 02
Plan the design
We talk through the finish directions that suit the room, the light and how the surface is used, and show physical samples so you can judge them in your own space.
- Finish direction for the room and light
- Physical samples in your space
- Texture and sheen
- Consistency across doors, frames and furniture
- 03
Sketch and agree the scope
We confirm exactly which surfaces are included, how edges and hardware will be handled, any approvals needed and the programme, so the quotation matches the work.
- Surfaces included and excluded
- Edges, joins and hardware
- Approvals and access
- Programme and quotation
- 04
Start working
Surfaces are cleaned and degreased, minor defects corrected, film is fitted with careful edge work and hardware is refitted. We inspect with you at handover and give care guidance.
- Clean, degrease and prepare
- Fit the film with edge care
- Refit hardware
- Inspect with you and give care guidance
Before the film goes on.
Preparation is where the result is won. This is what happens before any film is applied.
Surface review
Material, condition and edges are checked again on the day.
Cleaning
Dust and residue are removed so the adhesive can bond.
Degreasing
Essential in kitchens, where grease stops film from holding.
Minor preparation
Small defects are filled and the surface is keyed.
Hardware
Handles and hinges are removed or protected, then refitted.
Edge planning
We decide where edges and seams fall before any film is cut.
Finish direction
The chosen finish is confirmed against the room and light.
Sample confirmation
Physical samples are agreed before the final selection.
Minor preparation is not substrate repair.
Part of the job
- Cleaning and degreasing
- Filling small defects
- Keying the surface
- Removing and refitting hardware
Repair or replace first
- Swollen or rotting boards
- Delaminating laminate or veneer
- Damp or mouldy surfaces
- Flaking or unstable coatings
Film cannot repair a failing surface, and we do not promise it will. Read when wrapping is not the right answer.
A little help makes a better result.
- 01
Honest photos, including damage
- 02
Clear access and cleared surfaces on the day
- 03
Landlord or building approvals where needed
- 04
Gentle care afterwards, and early notice of any lifting
Show us the surface.
Send a few photos. We will say what looks suitable and what needs a closer look.
See what changes