01Before the day: the checklist

  1. Approvals. Landlord permission if you rent, and building-management notice for access, parking and deliveries.
  2. Clear surfaces. Empty cabinets, drawers and worktops to be wrapped. Remove items from walls and shelves.
  3. Protect belongings. Cover or move furniture and electronics from the work area.
  4. Agree access. Who will let the installers in, parking, lift booking and working hours.
  5. Confirm the finish. Final samples agreed, in writing if possible.
  6. Plan around the room. If it is the kitchen, plan meals elsewhere for the period.

02On the day

  1. Walk-through. The installers check surfaces against what was agreed and note any new damage.
  2. Hardware removal. Handles, hinges and fittings come off where practical.
  3. Preparation. Cleaning and degreasing, and minor corrections. This is slower than it looks and matters most.
  4. Fitting. Film is measured, cut and applied panel by panel, with attention to edges and corners.
  5. Refit and check. Hardware goes back and doors and drawers are tested.
  6. Handover. You inspect together and receive care guidance.

03Noise, mess and smell

Wrapping involves little dust and little noise compared with renovation, though hardware removal, cleaning and trimming do make some. There is little odour from the film, but cleaning agents used in preparation have a smell for a short time, so ventilate. Anyone sensitive to smells should say so beforehand.

04How long will the room be out of use?

That depends on size, number of panels, finish and surface condition, so we confirm it after assessment rather than quoting a fixed time. Ask for a realistic programme, including how long before surfaces can take normal use.

05Being at home or at the office during the work

You can often stay in the property, though the room being worked on is out of use. In commercial spaces, work may be phased or done out of hours. Tell the installer about children, pets and operating hours, and keep access clear.

06After installation

  • Inspect each surface with the installer before they leave.
  • Be gentle for the first days and keep heat and water off edges.
  • Follow the cleaning guidance. See how to clean wrapped cabinets.
  • Report any bubble or lifting edge promptly.
  • Keep the warranty in writing.

07Apartment, villa and office: what changes

SettingMain practical points
ApartmentBuilding rules on working hours, lift booking, parking and deliveries; neighbours; limited space to move furniture
VillaMore surfaces and rooms, easier access, scope often larger so the work is phased room by room
OfficeOut-of-hours work, phased zones, landlord approval, protecting equipment and data
Retail or hospitalityTrading hours, customer safety, cleaning-product compatibility, reopening time

08What to remove or protect

  • Kitchen: contents of cabinets and drawers, items on worktops, small appliances, anything stored on top of wall units.
  • Wardrobes: clothes and shoes, and anything hung on the door fronts.
  • Doors: hooks, door hangers and decorations; clear space around the swing.
  • Offices: computers, paperwork and personal items from desks and counters to be wrapped.
  • Everywhere: valuables and fragile items should be moved out of the work zone.

09What the installers need from you

  • Clear access to every surface being wrapped, including the sides of units against walls where agreed.
  • Working power, and water if cleaning needs it.
  • Good lighting, which matters more than people expect.
  • A named contact who can answer questions during the work.
  • Information about any recent damage or repairs.

10A realistic timeline

We do not quote a fixed time because it depends on the size of the job, the number of panels, the finish and the condition of the surfaces. What does help is knowing how time is usually divided: a surprising share goes on preparation and detail, not the fitting itself. A programme should show when preparation starts, when fitting happens, when hardware is refitted and when the surfaces can be used. Ask for it in writing, along with any assumptions such as access times.

11What can slow things down

  • Heavy grease or residue needing extra cleaning.
  • Damage discovered once units are emptied or doors removed.
  • Limited access hours or lift bookings.
  • Changes to the finish or scope on the day.
  • Surfaces that are not dry, for example after recent cleaning or a leak.

Most of these can be avoided with a proper assessment first.

12Handover: what to check

  1. Look at each surface in good light, from different angles.
  2. Check edges and corners, where lifting would start.
  3. Open and close every door and drawer, and test hinges and runners.
  4. Look for bubbles, creases, dust under the film and misaligned patterns.
  5. Check hardware is refitted and nothing is missing.
  6. Ask for care guidance and the warranty in writing.

Raise anything you spot before the team leaves. It is much easier to fix on the day.

13Aftercare in the first weeks

Be gentle at first: avoid heavy scrubbing, steam directed at edges, heat near panels and pulling at corners. Do not apply tape or adhesives to the surface. If you see a small lift or bubble, photograph it and contact the installer early. See why wrap peels or bubbles for what causes it and what to do.

14Illustrative day-of sequence for a kitchen

This is an example of a typical order of work, not a promise of timings.

  1. Walk-through and sign-off of scope; photographs of existing condition.
  2. Remove handles, hinges and any items in the way.
  3. Clean and degrease all surfaces, then correct minor defects.
  4. Wrap doors and drawer fronts, then end panels and any worktop or splashback in scope.
  5. Trim and seal edges, check corners.
  6. Refit hardware and test operation.
  7. Final inspection together, then care guidance.

15Frequently asked questions

Do I need to be there?
Someone should be available at the start and for the handover. Arrange access for the rest.
Do you remove my handles?
Where practical yes, so film can finish neatly around them. They are refitted afterwards.
Can I use the room straight after?
Ask for guidance for your film. Take care for the first days.
What if you find damage on the day?
We discuss options with you before proceeding, which is why an assessment beforehand matters.
Will there be a lot of mess?
Much less than a renovation, but expect some offcuts, cleaning products and moved furniture.
Can children and pets stay at home?
Keep them out of the work area. Tell us about them so we can plan safe working.

This guide is general information. Final suitability for your own surfaces is confirmed after inspection.